DOWNLOAD
Schedule of Tariff & Schedule of general service Charges (Applicable
w.e.f. 01-April-25)
New Tariff Rates
applicable w.e.f 01.04.2025
TARIFF CATEGORY
Slab (Units/month)
Normal Energy Charges
(Rs/unit)
Peak Energy
Charges (Rs/unit)
GoHP Subsidy on energy charegs
(Rs/unit)
Effective Energy
Tariff after
subsidy (Rs/kwh)*
Effective Peak Energy Charges (Rs/unit)
Fixed
Charge
(Rs/con/ month)
GoHP Subsidy on Fixed
Charge
(Rs/con/ month)
Effective Fixed
Charge
(Rs/con/ month)
Demand Charge (Rs/ kVA/month
Night Time Connection (NTC)
Domestic Supply (DS)
Lifeline
consumers Including BPL
0-60
4.72
4.72
0.00
55*
55*
55*
0
1st Slab
0-125
5.45
5.45
0.00
85/55*
85/55*
85/55*
2nd Slab
0-125
5.45
3.38
2.07
85/55*
0
85/55*
126-300
5.90
1.73
4.17
85/55*
0
85/55*
3rd Slab
0-125
5.45
3.38
2.07
85/55*
0
85/55*
126-300
5.90
1.73
4.17
85/55*
0
85/55*
Above 300
& above
5.90
0.00
5.90
85/55*
0
85/55*
Non-
Domestic Non-Commercial
(NDNCS)
Up to
20kVA
6.38
0.00
6.38
145
0
145
Above 20
kVA
6.12
0.00
6.12
0
0
0
140
Commercial Supply (CS)
Upto 20
kVA
6.40
0.00
6.40
145
0
145
Above
20-100 kVA
6.31
0.00
6.31
0
0
0
110
Above 100
kVA
6.21
0.00
6.21
0
0
0
170
Small Industrial Power Supply (SIP)
Up to 20
kVA
5.72
7.72
0.00
5.72
7.72
155
0
155
Above 20
kVA- 50 kVA
5.61
6.91
0.00
5.61
6.91
0
0
0
100
Medium Industrial Power Supply
(MIP)
50-100 kVA
5.61
6.71
0.00
5.61
6.71
0
0
0
120
Large Industrial Power Supply
(LIPS)
EHT 220 kV
and above
5.46
6.76
0.00
5.46
6.76
0
0
0
425
EHT -132
kV and above
5.51
6.76
0.00
5.51
6.76
0
0
0
425
EHT - 66
kV and above
5.56
6.76
0.00
5.56
6.76
0
0
0
425
HT-1 (up
to 1 MVA)
5.86
6.96
0.00
5.86
6.96
0
0
0
250
HT-2 (More
than 1 MVA)
5.61
6.96
0.00
5.61
6.96
0
0
0
400
(IDWPS)-Agriculture Consumer
Upto 20
KVA
5.04
4.74
0.30
105
0
105
LT
6.42
7.32
0.00
6.42
7.32
0
0
0
100
HT
6.02
7.12
0.00
6.02
7.12
0
0
0
300
EHT
5.62
6.92
0.00
5.62
6.92
0
0
0
400
(IDWPS)-Irrigation & drinking Water
Pumping Supply
Upto 20
KVA
5.04
0.00
0.30
105
0
105
LT
6.42
7.32
0.00
6.42
7.32
0
0
0
100
HT
6.02
7.12
0.00
6.02
7.12
0
0
0
300
EHT
5.62
6.92
0.00
5.62
6.92
0
0
0
400
Bulk Supply (BS)
LT
6.18
0.00
6.18
0
0
0
250
HT
5.68
0.00
5.68
0
0
0
350
EHT
5.48
0.00
5.48
0
0
0
350
Street Lighting Supply
(SLS)
6.37
0.00
6.37
145
0
145
Temporary Metered Supply
(TMS)
Up to
20kVA
8.30
0.00
8.30
200
0
200
Above
20KVA
7.68
0.00
7.68
0
0
0
400
Railway
Traction
> 20kVA
6.30
0.00
6.30
0
0
0
400
EV Charging Station
6.79
0.00
6.79
0
0
0
0
New Tariff Rates applicable w.e.f 01.04.2025 |
||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
TARIFF CATEGORY
|
Slab (Units/month)
|
Normal Energy Charges (Rs/unit)
|
Peak Energy
Charges (Rs/unit)
|
GoHP Subsidy on energy charegs (Rs/unit)
|
Effective Energy Tariff after subsidy (Rs/kwh)*
|
Effective Peak Energy Charges (Rs/unit)
|
Fixed Charge (Rs/con/ month) |
GoHP Subsidy on Fixed Charge (Rs/con/ month) |
Effective Fixed Charge (Rs/con/ month) |
Demand Charge (Rs/ kVA/month |
Night Time Connection (NTC)
|
|
Domestic Supply (DS)
|
Lifeline consumers Including BPL |
0-60 | 4.72 | 4.72 | 0.00 | 55* | 55* | 55* | 0 | |||
1st Slab | 0-125 | 5.45 | 5.45 | 0.00 | 85/55* | 85/55* | 85/55* | |||||
2nd Slab |
0-125 | 5.45 | 3.38 | 2.07 | 85/55* | 0 | 85/55* | |||||
126-300 | 5.90 | 1.73 | 4.17 | 85/55* | 0 | 85/55* | ||||||
3rd Slab |
0-125 | 5.45 | 3.38 | 2.07 | 85/55* | 0 | 85/55* | |||||
126-300 | 5.90 | 1.73 | 4.17 | 85/55* | 0 | 85/55* | ||||||
Above 300 & above | 5.90 | 0.00 | 5.90 | 85/55* | 0 | 85/55* | ||||||
Non- Domestic Non-Commercial (NDNCS) |
Up to
20kVA
|
6.38 | 0.00 | 6.38 | 145 | 0 | 145 | |||||
Above 20 kVA | 6.12 | 0.00 | 6.12 | 0 | 0 | 0 | 140 | |||||
Commercial Supply (CS)
|
Upto 20 kVA |
6.40 | 0.00 | 6.40 | 145 |
0 |
145 |
|||||
Above 20-100 kVA | 6.31 | 0.00 | 6.31 | 0 | 0 | 0 | 110 | |||||
Above 100 kVA | 6.21 | 0.00 | 6.21 | 0 | 0 | 0 | 170 | |||||
Small Industrial Power Supply (SIP)
|
||||||||||||
Up to 20 kVA | 5.72 | 7.72 | 0.00 | 5.72 | 7.72 | 155 | 0 | 155 | ||||
Above 20 kVA- 50 kVA | 5.61 | 6.91 | 0.00 | 5.61 | 6.91 | 0 | 0 | 0 | 100 | |||
Medium Industrial Power Supply |
50-100 kVA
|
5.61 | 6.71 | 0.00 | 5.61 | 6.71 | 0 | 0 | 0 |
120
|
||
Large Industrial Power Supply
|
EHT 220 kV and above | 5.46 | 6.76 | 0.00 | 5.46 | 6.76 | 0 | 0 | 0 | 425 | ||
EHT -132 kV and above | 5.51 | 6.76 | 0.00 | 5.51 | 6.76 | 0 | 0 | 0 | 425 | |||
EHT - 66 kV and above | 5.56 | 6.76 | 0.00 | 5.56 | 6.76 | 0 | 0 | 0 | 425 | |||
HT-1 (up to 1 MVA) | 5.86 | 6.96 | 0.00 | 5.86 | 6.96 | 0 | 0 | 0 | 250 | |||
HT-2 (More than 1 MVA) | 5.61 | 6.96 | 0.00 | 5.61 | 6.96 | 0 | 0 | 0 | 400 | |||
(IDWPS)-Agriculture Consumer |
||||||||||||
Upto 20 KVA | 5.04 | 4.74 | 0.30 | 105 | 0 | 105 | ||||||
LT | 6.42 | 7.32 | 0.00 | 6.42 | 7.32 | 0 | 0 | 0 | 100 | |||
HT | 6.02 | 7.12 | 0.00 | 6.02 | 7.12 | 0 | 0 | 0 | 300 | |||
EHT | 5.62 | 6.92 | 0.00 | 5.62 | 6.92 | 0 | 0 | 0 | 400 | |||
(IDWPS)-Irrigation & drinking Water Pumping Supply |
||||||||||||
Upto 20 KVA | 5.04 | 0.00 | 0.30 | 105 | 0 | 105 | ||||||
LT | 6.42 | 7.32 | 0.00 | 6.42 | 7.32 | 0 | 0 | 0 | 100 | |||
HT | 6.02 | 7.12 | 0.00 | 6.02 | 7.12 | 0 | 0 | 0 | 300 | |||
EHT | 5.62 | 6.92 | 0.00 | 5.62 | 6.92 | 0 | 0 | 0 | 400 | |||
Bulk Supply (BS)
|
LT | 6.18 | 0.00 | 6.18 | 0 | 0 | 0 | 250 | ||||
HT | 5.68 | 0.00 | 5.68 | 0 | 0 | 0 | 350 | |||||
EHT | 5.48 | 0.00 | 5.48 | 0 | 0 | 0 | 350 | |||||
Street Lighting Supply (SLS) |
6.37 | 0.00 | 6.37 | 145 | 0 | 145 | ||||||
Temporary Metered Supply (TMS) |
Up to 20kVA | 8.30 | 0.00 | 8.30 | 200 | 0 | 200 | |||||
Above 20KVA | 7.68 | 0.00 | 7.68 | 0 | 0 | 0 | 400 | |||||
Railway Traction |
> 20kVA | 6.30 | 0.00 | 6.30 | 0 | 0 | 0 | 400 | ||||
EV Charging Station | 6.79 | 0.00 | 6.79 | 0 | 0 | 0 |
0